Framing checks before the wall is covered
Before finishes conceal the framing, the built work needs comparison with the approved plans. That review includes the door and window openings, the specified structural details and any approved changes.
Required framing or structural inspections belong at this stage. Discrepancies need correction or an approved design change before the affected work is covered.
Structural alterations need professional review and permits where required. Check local requirements before construction. Within city limits, the City of San Diego Development Services Department handles these permits. County Building Services handles unincorporated property. The project location determines which office handles it.
Relevant 2025 California construction codes took effect January 1, 2026. The project’s application circumstances and local amendments determine which requirements apply.