Framing checks before the wall is covered
Before finishes conceal the framing, the built work needs comparison with the approved plans. That review includes the door and window openings, the specified structural details and any approved changes.
Required framing or structural inspections belong at this stage. Discrepancies need correction or an approved design change before the affected work is covered.
Structural alterations need professional review and permits where required. Check local requirements before construction. Within city limits, the City of San Diego Development Services Department handles these permits. County Building Services handles unincorporated property. The project location determines which office handles it.
Relevant 2025 California construction codes took effect January 1, 2026. The project’s application circumstances and local amendments determine which requirements apply.
What affects framing cost and timing
The number and size of openings affect the amount of structural work. In home additions and whole-home remodels, opening changes can also affect surrounding work.
Specified materials, access and existing conditions influence the framing cost. Concealed conditions become clear as walls are opened. If those conditions differ from the plans, the design may need revision before work continues.
Timing depends on plan revisions, permit review, material availability, inspection scheduling and coordination with other trades. A framing schedule needs to account for these steps before finishes can begin.