Skip to content
Finished kitchen with navy shaker cabinetry, stone counters and a marble-veined backsplash, lit by a window at the far end
Kitchen RemodelSan Diego, California

Navy Shaker Kitchen Remodel

A dated white kitchen kept in its original footprint and rebuilt from the walls in — navy shaker cabinetry, stone counters, a marble-veined backsplash and brushed gold hardware.

KitchenSame footprintNavy shakerStone countersMarble-veined backsplashBefore & after
Kitchen
Project type
San Diego
California
Same footprint
Full refit
CSLB #1083621
Permitted & inspected
01
The brief

Nothing moved, and everything changed

The kitchen already sat where it should. It opened to the dining space, the window was in the right place over the sink, and the run of the counters worked. What had aged was every surface in the room — white doors, a dark speckled counter, a small-tile mosaic backsplash and black appliances that had stopped matching anything around them.

That is a more common situation than a bad layout, and it is the one people most often over-solve. Moving a kitchen means moving waste, and moving waste is the single most expensive decision available in a remodel. Here there was no reason to make it.

So the footprint stayed exactly as it was, and the budget went into the things you actually touch and look at — cabinetry, stone, tile, hardware, lighting and appliances — rather than into relocating a sink by four feet.

The original kitchen with white cabinets, a mosaic tile backsplash and black appliances, open to the dining area Before
02
How it was built

Five stages, same four walls

A refit that keeps its layout still comes out completely empty first. There is no way to hang new doors around old ones and have the room read as finished.

The kitchen stripped of cabinets and appliances with bare walls and exposed subfloor
Before

Cleared out

Cabinets, counters and appliances out, and the room emptied back to bare wall and subfloor.

Wall repair underway with masked baseboards and a drywall panel set against the corner
Prep

Made good

Wall repairs, masked edges and protected floors. Unglamorous, and the reason the new work sits flat.

Navy shaker cabinet boxes installed along the wall with floors covered for protection
Cabinetry

Boxes set

Navy shaker boxes hung and levelled to a single line before any stone is measured.

Detail of the stone counter edge meeting a navy cabinet beneath the window
Stone

Counters set

Counters templated to the cabinets as built, not to the drawing, then cut and set.

The kitchen with cabinets and sink installed and the wall above the counter bare before tiling
Fit-out

Sink and services

Sink and plumbing reconnected, room cleaned down, backsplash still to come.

The original kitchen sink wall with white cabinets, a dark speckled counter and a mosaic tile backsplash Before
What was there

The counter that told you the year

A dark speckled surface and a small mosaic backsplash date a kitchen faster than the cabinets do. They are also the cheapest part of the room to change once the doors are already off — which is why the two get replaced together or not at all.

The replacement runs the other way: a pale veined stone across the counters and the same language on the wall behind, so the surfaces read as one field instead of three competing patterns.

03
The finished kitchen

Room to room

The finished kitchen seen from the doorway with navy cabinetry on both runs beneath recessed lighting
Stainless sink with a brushed gold faucet set beneath the window against the veined backsplash
The counter run with the cooktop and sheer curtains drawn at the window beyond
The kitchen seen along the hallway approach across new wood-look flooring
04
The result

A kitchen that stopped announcing its age

Navy shaker doors with brushed gold pulls, pale veined stone on the counters and carried up the wall behind, a chimney hood over the range, and recessed lighting replacing whatever ambient light the room had before. Stainless appliances throughout.

The layout a previous owner chose is the layout it still has. Everything you put your hands on is new.

SHEINER
Start your project

Planning a kitchen remodel?

We will tell you honestly whether your layout is worth changing — often it is not, and that is the cheapest advice in the project.

Services used on this project

CSLB License #1083621 · Licensed, bonded & insured